000 05680nam a2200277Ia 4500
005 20260803094222.0
008 251212s9999 xx 000 0 und d
245 1 _aDevelopment of a mobile planner for android /
_cChelsea T. Barrientos, Jhoema S. Elamparo, Nympha V. Hemedez.
240 1 _aFar Eastern University - Cavite
100 _aBachelor of Science in Information Technology
100 _d2014
700 _aXi, 207 leaves
700 _aColor illustrations
260 _aEnglish :
_bCollege Library,
300 _aDate : October 2014 Title : Development of a Mobile Planner for Android Author : Barrientos, Chelsea T. Elampro, Jhoema S. Hemedez, Nympha V. School : FEU-Cavite Degree : Bachelor of Science in Information Technology Adviser : Prof. Alvin Jason A. Virata, MIT Technical Adviser : Prof. Roberto Borja Year : 2014-2015 Key concepts : Android development tool (ADT), Email SYnchronization, Notification, Smartphone Application. Chapter 1 presents the studies of the Development of a Mobile Planner application, specifically for the Android Smartphone users. The chapter contains the problem of the statement, purpose of the study, conceptual framewrok, project description, scope limitation and delimitations and the significanceof the study. The study aims to resolve issues regarding Time Management. Time management is an act of which can only be controlled in a critical manner to produce efficiency and productivity of an individual person. The objective of the study is to provide a combined feature of activities in an event . In Chapter 2, the proponents indicated the review of related literatures, studies and systems. The literatures help in acquaring the basic idea of the nature of the application. Related studies discussed facts that form techniques in creating the application. And related systems provide a sample or an existing system or application that was assoociated to the proposed application. The contents had been a great contribution in developing the application. Chapter 3 discussed the way how the application was developed. Systems objective was presented as a guide to the developers in studying the flow of what should comes first by relying to development phase from planning, analyzing, designing to testing the progress of the application. The chapter also includes feasibility studies that involves technical, operational, economic, schedule and political feasibility. By that, the developers had planned on what language to use and the development tool. Moreover, this chapter provided the visual representations of the flow of data, interaction of the user and the activity that was formed. Chapter 4 showcased the results when the proponent conducted several surveys and data gathering and been evaluated by common users to prove the following study of the said system, that it will be essential in doing its functions; and also to meet the systems objective. The proponents come up with the evaluation using the sampling design. The respondents will be a student, businessman, employee, and professors. In addition, the application has been evaluated in specific categories in terms of functionality, reliability, security, maintenance and design. The respondents was also categorize into two; the expert an front-end users where in the total number of required experts was 10 and 20 persons in front-end users. Each respondent ranked the application in a scale of Agree with a range of 4.51-3.50. For the Q-Test evaluation for reliability, the value of front-end is 0.667 while the expert is 0.5 which shows that the evaluation passed the 90%, 95% and 99%. For usability, the corresponding Q-Test value of front-end is 0.333 while the expert is 0.5 which shows that the evaluation passed the 90%, 95%, 99%. For security, the corresponding Q-Test value of front-end is 0.25 while the expert is 0.75 which shows that the evaluation passed the 90%, 95%, and 99% confidence level. For interace design, the corresponding Q-Test value of frond-end is 0.6 while the expert 0.4 shows that the evaluation passed the 90%, 95%, and 99% confidence level. And lastly, for functionality. The corresponding Q-Test value of front-end is 0.08 while the expert is 0.5 which shows that the evaluation passed the 90%, 95% and 99% confidence level it means that the Mobile Planner passed the quality testing. Indicated in chapter 5 was the summary of findings which condences the result of the application after it was implemented, evaluated, and updated. It also has a conclusion that stated the alignment of the project to the systems objective. And lastly, the recommendations that the evaluators suggested for the enhancement of the application.:
_b1
300 _a1 pages
300 _d0
490 _aThesis
500 _a0
020 _atext
650 _aUnmediated
600 4 _avolume
942 _2lcc
_ctd
_ajpascua
_b2019-03-04 13:07:08
_djpascua
_e2019-03-04 15:25:04
943 _b0
_c0
_d0
_e1
_f0
_g0
_h0
_i0
_j0
998 _a10907
999 _c10837
_d10837